Implemented a monitoring interface for the condition and alerts for deviations in the operation of dynamic equipment
Increased the accuracy of failure prediction of ESP to 84%
Increased the average oil production rate per well to 1.6%
Mexico Block 4, Iraq West Qurna 2, R.U. Maganov Field
Reduced the average error of the virtual flow meter calculations to 1.8%
Reducing the number of
100% readiness for the start of SM has been ensured. SM was completed 5 days ahead of the planned schedule.
Reduction of the analysis time for the SCADA projects and telemechanics systems in terms of preparing MES BDRW tags. As a result, a decrease in the implementation timelines for MES projects
Reduced requirements for the bandwidth of data transmission channels. In some cases, data collection is carried out over channels with a bandwidth of up to 2 Mbps, implemented 10 or more years ago
Integration with adjacent/superior information systems (OIS products, SAP S4/HANA, ASTUE, etc.) has been implemented using various protocols (OLEDB/ODBC, REST API, OData)
MES LLC ASK allows the implementation of mathematical algorithms of varying complexity
Capital and operational costs optimized by $8.88 million